CHG160711 - Interac Annual e-Transfer Disaster Recovery (DR) Test

Scheduled Maintenance Report for Central 1

Completed

The scheduled maintenance has been completed.
Posted Jun 22, 2025 - 03:00 PDT

In progress

Scheduled maintenance is currently in progress. We will provide updates as necessary.
Posted Jun 21, 2025 - 21:00 PDT

Scheduled

Interac will be conducting their annual DR test on Saturday, June 21 from 9 p.m. to 3 a.m. PT (Sunday, June 22, 12 a.m. to 6 a.m. ET).

Interac has advised that there will be two outages of 45 minutes each, as traffic needs to be stopped allowing 30 minutes for existing connections to drain, followed by 15 minutes to perform the database switch, totaling 45 minutes. Similarly, another 45 minutes while coming back from DR site to Production site. There will be no send, receive, processing, or functionality of any kind for e-Transfer during the following times: 11 to 11:45 p.m. PT (2 to 2:45 a.m. ET) and 1 to 1:45 a.m. PT (4 to 4:45 a.m. ET).

Central 1 - support@central1.com - 1.888.889.7878, press 1
Posted Jun 16, 2025 - 13:27 PDT
This scheduled maintenance affected: Payment Services.